Preinsulated pipes, preinsulated arches, muffs, end caps, DN 500 diameter rings and other accessories necessary for laying the heating pipeline
Description of the investment
The district heating network in the Warsaw district heating system is made both in duct and pre-insulated technology. Currently, the technology of the traditional sewer network is outdated, and the amount of heat and water losses in the network leads to the need to modernize the network. Reducing heat losses on transmission also reduces carbon dioxide emissions in the atmosphere.
The investment was carried out as part of the project “Modernization of the Warsaw district heating network in the Capital City of Warsaw”, which aims to reduce CO2 emissions and improve energy efficiency.
Reconstruction of sections of the district heating network: from chamber S-18 to chamber S24 with connections to buildings at 1 Szpitalna Street and 4 Zgody Street in Warsaw. The investment was aimed at reducing carbon dioxide emissions and improving energy efficiency, thus reducing the emissions of the economy.
The location of the investment, in the very centre of Warsaw, requires us, as a supplier of goods, to meet a rigorous schedule of delivery dates and a timely and efficient implementation by the Contractor. Failure to observe these elements would result in a delay in the commissioning of the investment, which would prolong the already existing transport difficulties and could deprive direct customers of the comfort of hot water and central heating.