Construction of a preinsulated pipeline for the transmission of process steam at a temperature of 210-240⁰C

Construction of a preinsulated pipeline for the transmission of process steam at a temperature of 210-240⁰C

Location
Kostrzyn nad Odrą, Poland

Completion of work
2024/2025

Purpose
Industrial pipeline

Product
Process steam pipes, preinsulated bends, joints and other accessories necessary for laying the pipeline

Description of the investment
Today, the construction of transmission networks for steam transfer, e.g. in industrial plants, requires designers and investors to use non-standard solutions that guarantee high functionality and increased durability. So far, standard solutions for transporting media in transmission networks based on an insulation layer covered with a jacket of galvanized sheet metal or stainless steel may turn out to be ineffective compared to the latest pipe solutions based on Radpol Pipes technology.

The steam pipeline in Kostrzyn nad Odrą will connect ECO Raven with the ITT Plant.

The photo above shows a welded preinsulated pipe for transmitting process steam.

The photos below show steam generators connected to the Radpol Pipes pipe system.